The Workshop Museum · Build Board
Working Map
This site is being built in the open. Here is the whole thing at a glance — what each room is, what's live, what's still loose, and how urgent. Hover (or tap) any card for its program of works. Come back and watch it grow.
✓ Done
○ To do / in progress
▤ Not started (hatched bar)
✓✓✓ highest priority
✓✓ medium
✓ lowest
↓ hover a card to see its detailed to-do list · % bar shows how built each room is
✓P3
🏠
Entry hall — museum wall, doorways
Built95%
Program of works
- Museum-wall horizontal rail
- 8-room navigation
- Selected Sleaford photos wired in
- Image Stack doorway added
- Midsummer Festival feature doorway added
- Finalise the long-term museum-wall order
Next: keep the front wall aligned with the live project strands
✓P3
👤
Who Damen Hartley is
Built85%
Program of works
- Artist-name / alter-ego statement (31 May)
- Page styled to warm museum
- Damen Hartley to confirm copy is final vs draft
Next: Damen Hartley sign-off on wording
✓✓P2
🏘️
The place & the photographic study
Built85%
Program of works
- Page + transition research section
- UKSPF newsletter captured as evidence
- First book panel with Amazon link
- Midsummer Festival feature route
- Fold in deeper public-opinion research once verified
- Add thesis images when the wall set is agreed
Next: build the original-source coding sheet behind the public summaries
✓✓✓P1
☀
Public life, response and people leads
Built90% · live feature
Program of works · built 25 Jun
- 22 supplied festival photos installed
- Feature essay: When Sleaford sees itself
- Public-response themes handled without raw quotes
- People of Sleaford interview leads added
- Verify original Facebook thread before publishing direct quotes
Next: use as the bridge into portrait/interview work
✓✓P2
🏛️
Places that hold water, craft and memory
Built90% · live room
Program of works · built 16 Jun
- Homepage Landmark Room route corrected
- Cogglesford Mill installed as first full exhibit
- First exhibit rebalanced as image-led gallery label
- Look / Notice / Dig visitor route built
- Respect line added for official heritage sources
Next: grow the room by deliberate landmark selection
✓✓P2
🖼️
Photography · research · making
Built75%
Program of works
- Page scaffold + nav
- Photography, Image Stack, Cogglesford and Postcards routes
- People of Sleaford / Festival feature route
- Photography: final museum-wall set
- Research: Sleaford in Transition write-up
- Making: tool-stand / leather craft entries
Next: decide the 3 sub-strands' first content
✓✓✓P1
🗂️
Curated rants and journal extracts
Built65%
Program of works
- Curated rants archive scaffold
- Public/private status pills
- Selected journal extract cards
- Review which raw pieces can become full public pages
- Separate gallery-wall work from reading-room archive
Next: keep raw originals protected until reviewed
✓✓P2
▣
Bright retail-style Sleaford set
Built80% · live draft
Program of works
- Postcard room built as a distinct house style
- Lead postcard imagery installed
- Confirm final sellable postcard set
- Decide whether retail links belong on public site
Next: review as a product strand, not just a gallery page
✓P3
🧭
The making-of / museum journey
Built90%
Program of works
- Journey road and making-of route
- Searchable timeline route maintained behind private side
- Timeline regenerated after current work
Next: keep the public journey concise as the archive grows
✓✓P2
→
Look / Understand / Dig path
Built80%
Program of works
- Visitor path separated from site map
- Home page signpost route
- Look / Understand / Dig language established
- Refresh after each major public room addition
Next: check whether the new Festival route belongs in the first walk-through
✓P3
⚙️
How the work is made
Built80%
Program of works
- Cabinetmaker process + UX principles
- Meta AI research-handling rule established
- Add house edit/processing report when the photo style settles
Next: house edit style write-up
✓✓✓P1
📚
Flip through the not-on-the-wall images
Built85% · live draft
Program of works · built 8 Jun
- Designed the gallery-rack flip interaction (bottom-edge hinge)
- Fed 14 STACK-tagged photos from curation (portraits removed)
- Built gallery component + no-JS contact-sheet fallback
- Linked from Projects + sitemap
- Captions rewritten in Damen Hartley’s voice
- Damen Hartley final review of captions / image set
Next: Damen Hartley’s review, then lock as v1
✓✓P2
🏞️
Landmark exhibit · water, grain, timber, time
Built90% · live exhibit
Program of works · rebuilt 16 Jun
- Calendar angle removed
- 20-image curated set exported for web
- River Slea triptych added
- Interactive Cabinet of Looking built
- Official source links added
Next: Damen Hartley review of image order and captions